From December 20th to January 1st our company is closed, we will be happy to serve you again on January 2nd.
PUK Benelux wishes you very happy holidays!

UKR 2 cable duct bottom piece, 2-compartment

open cable duct bottom piece with two compartments made of Sendzimir hot-dip galvanized sheet steel with a separating strip.

The screed-covered cable duct includes the following components: 1x lower part of cable duct UKR, 1x cable duct dummy lid UKD and 1x separating strip UKTR with corresponding installation and connection materials.

data sheet Assembly Instruction
Continously hot galvanized (Sendzimir process) (DIN EN 10346)
heightwidthlengthweight
UKR 35-30S35 mm300 mm3000 mm8,9 kg
Memolist
No items in memolist
inclusive accessoires