UBEBES duct end part

    End piece, adaptable to floor cover thickness (25mm) for closing the screed-flush brush duct.

    data sheet
    Continously hot galvanized (Sendzimir process) (DIN EN 10346)
    HminMinimum installation heightN levelling rangewidthweight
    UBEBES 85-25S80 mm25 mm250 mm0,88 kg
    Memolist
    No items in memolist
    inclusive accessoires